How are steel-reinforced concrete drainage pipe pressure testing machines marked? 1. Turn on the power. 2. Press the "zero" key to clear zero. 3. Select the position to be calibrated (1000kN or 2000kN). 4. Press the "calibration" key. 5. Enter the password "761013" and press the "OK" key, then "C0" representing zero will be displayed.
What is the marking method for the reinforced concrete drainage pipe pressure testing machine?
1. Turn on the power.
2. Press the "zero" key to clear zero.
3. Select the position to be calibrated (1000kN or 2000kN).
4. Press the "calibration" key.
5. Enter the password "761013" and press the "OK" key. "C0", representing zero points, will be displayed.

6. Press the "Start" button to start the motor.
7. After pressing the "OK" button, C20 will be displayed.
8. Close the return oil valve, open the oil supply valve, load smoothly, slowly lift the piston, and stabilize the oil supply valve. The display may not show 0.0 at this time (1.0 is the allowable value). Verification starts from 20% of the rated load (e.g., 20% of a 2000kN pressure machine is based on 400.0kN, measuring ring). Verification must be 5 points.
When the dynamometer is close to 20% of the rated load, close the small oil valve and slowly approach 20% of the rated load (e.g., 20% of a 2000kN pressure machine is based on 400.0kN measuring ring). Press the "Confirm" button upon reaching, and 20 percentage points are completed.
9. Display 40%, 60%, 80%, 100% in the same order. After 100% is completed, the system will automatically exit the calibration state. However, it must be completed entirely for the system to save this value.
10. Open the return oil valve and close the oil supply valve.
If the digital display and dynamometer display differ significantly, usually only one or two calibrations are needed. After calibration, the system must be checked. The system can randomly detect 6 data points, usually 20%, 40%, 60%, 80%, 100%, and 0% of the specified maximum load.
How to install and debug the reinforced concrete drainage pipe pressure testing machine?
1. Installation
After opening the packaging of the pressure testing machine, there is an installation screw hole covered with a nylon plug on the machine body. Open the nylon plug, screw the randomly included M20 installation screw back into the screw hole, and use a hoist to hang it in the preset location.
For ease of operation, the machine must be placed on a prefabricated 720mm x 600mm cement base 300mm above the ground. After horizontally installing the machine, use clean cotton yarn soaked in kerosene to wipe off the rust inhibitor applied to the processed surface of the machine, then wipe the surface clean and apply a thin layer of machine oil.
2. Debugging
(1) Add oil
Use a screwdriver to remove the fastening screws on the rear cover and remove the rear cover. Then, inject an appropriate amount of machine oil at the 40mm hole on the oil tank cover.
Inject an appropriate amount of oil to reach the middle position of the oil standard.
After adding oil, cover the rear cover.
Note:
Use GB443-84N68 machine oil when the ambient temperature is 15°C.
Use GB443-84N100 machine oil when the ambient temperature is 25°C.
(2) Electrical connection
Insert any power plug into the corresponding socket. The power supply is 380V 50Hz.
(3) Pump exhaust start
Open the return oil valve and open the loosening oil valve. After turning on the machine power, the display becomes random. Press the "Start" button to start the motor, and the oil pump starts working. After continuous operation for about 1 minute, close the return oil valve. It can be seen that the pressing plate slowly rises. When the pressing plate rises to about 20 mm, close the oil valve, and the pressing plate is in the falling state. Repeat the above steps 3 to 4 times to completely remove the gas in the system.