How to install and debug a reinforced concrete drainage pipe pressure testing machine?
Release Date:
2022-08-15
How to install and debug a reinforced concrete drainage pipe pressure testing machine? Reinforced concrete drainage pipe pressure testing machines are used to test the mechanical properties of various materials, such as static load, tension, compression, bending, shear, tear, and peel. They are suitable for testing various physical and mechanical properties of materials such as plastic plates, pipes, profiles, plastic films, rubber, wires and cables, steel, and glass fiber.
How to install and debug a reinforced concrete drainage pipe pressure testing machine?

The reinforced concrete drainage pipe pressure testing machine is used to test the mechanical properties of various materials, such as static load, tension, compression, bending, shear, tear, peeling, etc. It is suitable for testing various physical and mechanical properties of plastic plates, pipes, profiles, plastic films, rubber, wires and cables, steel, glass fiber and other materials. This time, we will share the installation and debugging methods of the reinforced concrete drainage pipe pressure testing machine.
I. Installation of reinforced concrete drainage pipe pressure testing machine
1. Place the testing machine on a platform or cement floor, and adjust the level of the testing machine by adjusting the adjusting screws under the base. The levelness of the testing machine worktable is no more than 0.2/1000. After adjustment, tighten the nuts on the adjusting screws.
2. Check if the voltage is correct. After confirmation, insert the plug into the socket. At this time, the display screen should show digital display, and the red indicator light above the stop button will light up;
3. Check if all keys are working properly. When a key is pressed, the relevant content should be displayed;
4. Safety protection performance test
II. Debugging methods of reinforced concrete drainage pipe pressure testing machine
1. Overload automatic shutdown test
Use samples exceeding the test force for testing. When the test force exceeds 2~10%, it will automatically stop. When the test force exceeds 2~10% of the set force, it will automatically stop.
2. Sample 3360 fracture stop test
Press the speed selection key to select any gear and perform tension test for clamping test.
After the sample is pulled down, the machine will automatically stop. This function must meet more than 1% of the rated force of the selected gear for the actual test force of the sample. For example, for a testing machine model TY8000, the rated test force is 100kg, and the actual test force of the selected sample should be 1kg. If the actual test force is 1kg, the machine will not automatically stop when the sample is pulled down.
3. At the upper and lower limits: Stop the test
Press the up or down button. When the moving plate reaches the upper and lower limit positions, it should stop automatically. Note that it should be carried out at a lower speed. (After the moving plate touches the limit switch, the power will be automatically cut off. At this time, you can only insert the handle into the lower right hole of the machine, rotate the transmission mechanism, and make the moving beam separate from the limit switch to turn on the power. To avoid danger, you can start the machine after removing the handle.
After understanding the installation and debugging methods of the reinforced concrete drainage pipe pressure testing machine, the operator must use the testing machine according to the process specifications in the manual. Otherwise, it is easy to cause machine failure and personal injury. If you have any questions during operation, please contact us, and our technicians will answer them one by one. We have many years of experience in this industry and can introduce more relevant content from different aspects.