Key points for using a pressure testing machine. A reinforced concrete drainage pipe pressure testing machine manufacturer explains.
Release Date:
2022-08-29
Reinforced concrete drainage pipe pressure testing machine manufacturers believe that cement pressure testing machines are one of the main instruments and equipment in cement enterprise laboratories. The technical condition of the pressure testing machine equipped in the laboratory largely reflects the technical level of the laboratory. After the 1980s, it entered the era of fully automatic testing machines with microcomputer control. Therefore, computer-controlled pressure testing machines have the characteristics of high precision, low cost, and high stability, and are the future development trend of testing machines.
Reinforced concrete drainage pipe pressure testing machine manufacturers believe that cement pressure testing machines are one of the main instruments and equipment in cement enterprise laboratories. The technical condition of the pressure testing machine equipped in the laboratory largely reflects the technical level of the laboratory. After the 1980s, it entered the era of fully automatic testing machines with microcomputer control. Therefore, computer-controlled pressure testing machines have the characteristics of high precision, low cost, and high stability, and are the future development trend of testing machines.
Reinforced concrete drainage pipe pressure testing machine manufacturers believe that the precautions for using cement pressure testing machines are: Compared with traditional pressure testing machines, microcomputer-controlled automatic pressure testing machines have certain differences in use and maintenance, which should be noted.
1) Operators must be trained before working. Microcomputer-controlled automatic pressure testing machines are generally equipped with microcomputers and control software, and test operations can be completed through the keyboard, which is very different from traditional manual testing machines. Therefore, operators should be systematically trained to learn basic microcomputer operation and simple maintenance.
2) The microcomputer should be dedicated to the machine. As far as the microcomputer equipped with the testing machine is concerned, its reliability and stability are important. Frequent misuse and illegal attempts often lead to microcomputer failure, or even severely shorten its service life, which is definitely not worth the loss. Therefore, the microcomputer equipped with the testing machine must be dedicated to the machine, kept by a dedicated person, and cannot be used for other purposes.
3) Try to improve the operating environment of the testing machine. In the use of the testing machine, attention should be paid to dust prevention and grounding protection, because dust, like moisture, is a taboo for electronic products such as microcomputers. Reliable grounding is very important for protecting personal safety and microcomputer safety and cannot be ignored.
Reinforced concrete drainage pipe pressure testing machine manufacturers believe that the key points of operation of the pressure testing machine are:
1. The pressure testing machine should be installed in a dry, clean, vibration-free, and corrosion-free gas place to ensure that the accuracy is not damaged. It is strictly forbidden to install it in a humid place;
2. The operation of the pressure testing machine must be operated by trained professionals or supervised by professionals to ensure safety;
3. In daily use, the pressure testing machine must be careful not to overload the pressure measuring element and be subjected to heavy impact to ensure the accuracy of the pressure testing machine;
4. Regularly check whether the upper and lower limit fastening nuts of the micro-switch are loose, and adjust them in time if they are found to be loose;
5. In the process of pressure testing with a pressure testing instrument, first confirm the direction of tensile compression, and confirm whether the push-pull switch or signal light of the display is correct;
6. Reinforced concrete drainage pipe pressure testing machine manufacturers believe that non-professional maintenance personnel are prohibited from tampering with the components inside the control box back door;
7. Check the tightness of the chain every six months.